Solar generation
On-site PV, DC-coupled straight to the bus — powers the load and charges storage in daylight.
Sunverters are modular off-grid datacenters — 200 kW full-DC containers scaling to 1 MW sites, vertically integrated from electrons to LLM tokens. No grid queue. No Cloud Act. No compromise.
Inference demand is compounding, but Europe's grid-connection queues now run 7–10 years. The fastest way to add compute: stop waiting for the grid and bring your own clean power.
Cheap solar, cheap storage and open-weight models make something newly possible: off-grid token factories, on European soil.
"It's not a supply issue of chips; it's the fact that I don't have datacenters to plug into."
Satya Nadella · CEO, Microsoft
Concept stage — no sites deployed yet. The Q3 2026 proof-of-concept either clears these four gates, or we tell you why not.
Solar → grid-forming BESS serving a real IT load, monitored across the stack.
Gate: ≥95% service uptimeLive tokens from 8–16 GPUs, throughput benchmarked per GPU, measured €/GPU-hr.
Gate: ≥85% GPU utilisationThree or more workload types auto-scheduled by Sundial to energy availability; two PoC sites share load dynamically.
Gate: autonomous load balancingSustained token generation sold through public inference marketplaces.
Gate: 3 marketplaces · 100+ customers/dayEach gate retires a named risk. As measured results land, they replace these targets on this page.
Two complementary layers keep a site powered around the clock.
On-site PV, DC-coupled straight to the bus — powers the load and charges storage in daylight.
Grid-forming batteries hold the site's island grid, shifting daytime energy into the night without conversion losses.
Inference is flexible — so it's scheduled into each site's solar peak, and redirected across the mesh to sites still in full sun. Clean power, always in use.
Self-powered, factory-built datacenters — deployable wherever the sun shines.
We place Sunverters next to abundant renewable energy, not at the back of a multi-year grid queue.
The solar + BESS stack delivers islanded power, with no draw on — or strain to — the public grid.
Containerized builds go from greenfield to serving inference in months — then capacity grows node by node, close to demand.
| Requirement | Traditional / training DC | Token factory (us) |
|---|---|---|
| Uptime need | Five-nines, always | Batch-tolerant |
| Latency | Critical | Tolerant — batch-friendly |
| Typical size | 20–100+ MW | ≤1 MW modules |
| Grid connection | Mandatory | None — off-grid |
| Time to power | 3–5+ yrs in the queue | ~6 months, factory-built* |
Inference-only permits a radically simpler design — one that fits solar. *Design targets, v0 engineering estimates: ~15–20% lower CAPEX, ~5–10% lower energy cost.
Your inference is processed in the European Union, under EU jurisdiction.
Vertical integration captures the value middlemen take at every stage.
No colo, no cloud, no aggregator markup — direct from our sites to token marketplaces.
A machine for converting sunlight into tokens — 200 kW, air-cooled, full-DC, in a standard 40 ft container. Up to five per site, 1 MW max.
*GPU density is a target figure and tracks GPU generation.
Energy, data-center infrastructure, and cloud operations — the exact combination this thesis requires.

Global VP DC Systems, Schneider Electric · 21 yrs of data-center infrastructure at global scale
LinkedIn ↗
CTO at Symbio, VP Research & Innovation · 23 yrs in hydrogen, BESS & solar
LinkedIn ↗
Founder & CEO, PlusClouds · 20 yrs running a cloud business
LinkedIn ↗