Star Trails 11-20-26
07:31 Saturday, 21 November 2026
Current Wx: Temp: 43.41°F Pressure: 1027hPa Humidity: 82% Wind: 7.99mphWords: 913
Skies have been very clear the past few nights. I finally got motivated to put the tripod back on the patio again. The shadow cast on the wall from the porch roof is from the moon.
There's roofing now. But 9 panels were damaged in delivery, so it's not finished. They're supposed to be here Monday and should go up the same day, weather permitting.
The front door adventure continues. It's got a fancy locking system, which requires a special adapter, which did not come in the box, despite what the store said. So I drove out to the place where Mitzi ordered the door from yesterday and picked it up, over on the east side of Cayuga Lake. Took almost an hour, but it was a beautiful day, and I had to stop by a plumbing supply store and pick up a stand for the heat pump.
I'd already ordered the stand recommended by the heat pump manufacturer and it was a piece of crap, and it would have been too small in any case. Over $400. Of course, we didn't learn all that until after I'd assembled it. My builder thought we could modify it to make it work, but I didn't want to do that so I went searching for another one.
As these things often seem to go, it was a smart thing to do. I managed to find a much better stand, made in America, for less money.
A brief digression. The plumber who is going to help do the hydronic install was here on Thursday to install a circulator pump in the heat pump. It ships with the pump, but not installed, because reasons. On Wednesday, enjoying sunshine and temps in the 60s, it dawned on me that even though we weren't ready to start doing the install, it was probably the right time to install that pump! Otherwise we might be doing it in the wind and the snow. So I called Gary the plumber and he was free Thursday, so he came by and installed the pump. I won't go into the struggles we had removing the panels of the heat pump. I mentioned to Gary I was having trouble identifying a temperature and pressure relief valve for the hot water tank, and he told me he buys all his supplies from Irr Supply, and they could probably help.
The stand manufacturer doesn't sell direct, so I had to locate a distributor. Surprise, surprise, surprise, Irr Supply is a distributor! So I called the one in Ithaca, which was closer to the door place, and asked if they had one of the specific model I was looking for in stock. Turns out they did. One. I told them to put my name on it and I'd be out to pick it up later that day.
I wanted to get started right away, but Brad the builder is trying to get all the wiring run for the lighting so they can start putting up ceilings, so they can install insulation above the ceilings. We'd already done the "private" portion of the main floor, so this was going to be Home-run 2, the entryway, closets, island pendants, display niche and dining "room" table light.
Of course, Mitzi had hit the road early that morning, heading to DC to be with her family for a few days before flying to Atlanta to spend some time with her sister who is going through a serious health crisis. She'll be gone for nearly two weeks, and positioning that dining room light was something she would have definite opinions on. Brad, Derrick and I cleared the floor and taped out the kitchen island, and the entryway wall so that we'd have some visual points of reference. Mitzi pulled off outside Harrisburg, PA and we did a FaceTime call and tried to sort it all out.
We figured something out. Derrick's the electrician and he's got to hang the box for this light, and he doesn't want to do it twice. If we have to make any adjustments, we can probably just swag the chain over, so it'll probably be ok.
So I got on the road after that and spent a couple of hours behind the wheel, listening to music and enjoying the scenery. Again I was reminded of how pleasant a drive can be. When I got to Irr Supply, they had the stand waiting for me. I asked about the temperature and pressure relief valve. I'd brought along the drawing from the manual, but they wouldn't sell a safety device to me because I wasn't a licensed plumber. It didn't occur to me to call Gary and see if they'd put it on his account, at least I'd have it in hand. But all in all, it was a productive trip.
I put the stand together yesterday afternoon, 24 hours after I'd put together the first one. This one was much simpler to assemble, and the build quality was an order of magnitude better. The first one was steel with a shoddy "powder-coat" finish. (Scare quotes because I think it's just enamel paint.) The new one was heavy-gauge aluminum with a beautiful powder-coated finish.
In case you're considering putting in a heat pump or mini-split, and you live in the snow belt, Pro Stands is right here in the Finger Lakes!
Time to go take out the trash and recycling.
The beat goes on...
✍️ Reply by email