Trans Permian Energy
Powering the Future of Texas
Trans Permian Energy is a 220 MW facility in Pecos County, Texas, converting Permian natural gas into low-carbon hydrogen and around-the-clock power, with carbon capture built into the design.
Texas is adding roughly 50 GW of new large load by 2030.
We're building for that future.
Trans Permian Energy is addressing Texas’s growing power needs by building reliable, locally generated power. Always on, always close to home.
The Challenge
The Fastest-Growing Power Demand in America
Texas is adding population, industry, and advanced manufacturing facilities faster than it’s adding power. The fix isn’t new technology, it’s building generation close to the load, ready to run, on the timeline demand actually arrives.
Projected supply deficit, Far West Texas by 2030 (ERCOT)
Our Solution
Firm Power, Generated Locally
Trans Permian Energy is developing a combined-cycle facility that turns Permian natural gas into low-carbon hydrogen to generate reliable, on-demand power, capturing CO2 for enhanced oil recovery and delivering power locally, on- or off-grid. Phase 1 is 220 MW, scaling toward 1 GW.
Platform scale across future phases
Gas-to-Power with Carbon Capture
The Project
The Trans Permian Energy Project
The Trans Permian Energy Project is designed as a 220 MW combined-cycle facility integrating blue hydrogen production with carbon capture and utilization.
- Location: Pecos County, Texas, approximately 15 miles northeast of Fort Stockton
- Market: ERCOT West Load Zone
- Scalability: Toward 500 MW in Phase 1, and beyond 1 GW across later phases
- Generation: Combined cycle, hydrogen-capable
- Site: Approximately 1,000 owned acres
- Status: In development
The Technology
Proven Technology, Assembled Differently
Every technology in this facility is commercially established. Natural gas reforming, carbon capture, combined-cycle generation. All off-the-shelf technology.
What is different is the combination. Bringing hydrogen reforming, carbon capture, and hydrogen-capable combined-cycle generation together into a single integrated system has not been done in an inland Permian context.
Delivered without waiting on grid interconnection
Why it Matters
More than Power
Grid Reliability
Capacity that runs on demand, added where ERCOT projects the largest shortfall.
Advanced Manufacturing
Power available for computing infrastructure that cannot wait years for interconnection.
Infrastructure Investment
Long-lived assets built to current standards in a region positioned for decades of growth.
Job Creation
Skilled construction trades during the build and permanent technical roles in operations.
Why West Texas
Built Where the Fuel Is
The Permian Basin produces more natural gas than almost anywhere in North America, and much of it trades at a discount to national benchmarks because there is more supply than there is local capacity to move it or use it.
That makes West Texas an unusually good place to generate electricity. The fuel is abundant, local, and inexpensive. The industrial demand is immediate and growing. And the region sits inside ERCOT Far West, the market where that power is needed most.
The Trans Permian site is roughly 15 miles northeast of Fort Stockton in Pecos County, on approximately 1,000 owned acres in the ERCOT West Load Zone. It holds an issued Water Use Permit, fiber connectivity, and hard-top county road access.
Learn more about Trans Permian
Reliable Power for a Growing Texas
Explore the project or connect with our team to learn more about Trans Permian Energy.